Mohammad Rasoul Rajabi; Ali Nasiri Khiavi; Mahin Kalehhouei; Sonia Mehri; Azam Mumzaei; Khadijeh Haji; Abdulvahed Khaledi Darvishan
Abstract
The present research aimed at presenting a new SWOT strategy for integrated watershed management of Asiabrood in Mazandaran Province. At first, the SWOT matrix and the tables identifying the strategic indicators of internal and external factors were formed and then internal and external evaluation matrices ...
Read More
The present research aimed at presenting a new SWOT strategy for integrated watershed management of Asiabrood in Mazandaran Province. At first, the SWOT matrix and the tables identifying the strategic indicators of internal and external factors were formed and then internal and external evaluation matrices were analyzed. A new strategy used in the discussion of the weighting of SWOT strategies was based on the fact that the final value of each strategy was multiplied by the number of effective strengths and opportunities and the final results were analyzed based on these priorities. Based on analysis of strengths and weaknesses, nine strengths and eight weaknesses were identified. The suitable water quantity and quality with a weight of 0.444, low air temperature with a weight of 0.395, mineral water utilization with a weight of 0.288 and economic poverty with a weight of 0.493, respectively, were the most important strengths, weaknesses, opportunities and threats. According to the internal-external factors evaluation matrix in the SWOT model, the strategy of increasing the sense of satisfaction of residents, based on the conventional method and the new strategy, gave the highest value. With a careful look, it can be concluded that strengthening the sense of satisfaction between residents happens when People problems in different sectors of livelihoods, including economic, social and cultural, have been considered more and, by presenting correct programs, have increased satisfaction and reduced migration to urban areas. In general, it can be concluded that due to the problems and solutions presented in this study, proper and applied planning should be used to compensate for the weaknesses and to strengthen the strengths as much as possible in the development of Asiabrood watershed.
Ali Nasiri khiavi; Raoof Mostafazadeh; Abazar Esmali Ouri; Omid Ghafarzadeh; Mohamad Golshan
Abstract
The hydrological regime of a river is the main influencing factor on the dynamics of river ecosystem and damming operations have a significant impact on river flow discharge. Therefore, the main objective of this research was to investigate the combined effects of changing climate variables and ...
Read More
The hydrological regime of a river is the main influencing factor on the dynamics of river ecosystem and damming operations have a significant impact on river flow discharge. Therefore, the main objective of this research was to investigate the combined effects of changing climate variables and the Yamchi Dam construction on the discharge flow of the Balkhlu-Chai River in Ardebil using IHA Software 7.1 during the pre and after dam construction period (1973-2003) and (2004-2014). Toward this, the trend in the amounts of precipitation, temperature and evapotranspiration variables were evaluated using MAKESENS software. Then, the changes to 33 hydrological parameters and Range of Variability Approach (RVA) were firstly estimated. Subsequently, changes in the parameters of the flow rate in the periods before and after dam construction were investigated in the magnitude, duration, timing, frequency and rate of change categories. According to the results of trend analysis the precipitation had a significant decreasing trend, while, the temperature has been increased during the available time period. Based on the results, about 92% of the minimum flow discharge was attributed to that after the dam construction, while 25% of the maximum discharge belongs to this period, which indicates a decrease in the magnitude of discharge flow due to the dam construction and decreasing trend of rainfall. Also, the number of high flow pulses during the period of before dam construction was 38% higher than the period of after dam construction, while the number of low pulses in the period after dam construction was reduced by 60.7% compared to the period pre-dam construction. The value of Rise Rate index in the after-dam construction period is 0.11, but in the period before the dam construction is 0.3, which indicates a notable decrease in the mentioned indicator. Generally, based on the Magnitude group parameters, it can be concluded that the average amount of river flow during the period after the construction of the dam decreased by 52% compared with the period before the dam construction which lead to considerable environmental issue regarding the river ecosystem and flow condition. It should be noted that the variation in the hydrologic indicators is mainly influenced by the dam construction and also the change of climate variables has also been influential in this regard, and the separation of affecting factors need to be considered in further studies.